Can a Florida Condo Association Require Approval Before You Renovate Your Unit?

Benjamin L. Lipson

|

Short answer: Often, yes. It depends on what you plan to change, what the condominium documents require, and whether the work affects anything outside the legal boundaries of your unit.

With rental units, this question often comes up after a tenant moves out. The owner wants to replace the flooring, update a bathroom, or improve the kitchen before renting or selling the unit. The contractor may consider it a simple interior renovation. In a condominium, it may not be that simple.

The first place I would look is the declaration and its exhibits. Florida law requires those documents to identify the units and common elements. That matters because the walls, floor slab, plumbing, windows, balcony, and air-conditioning components serving a unit are not necessarily owned or maintained entirely by the unit owner. Section 718.104, Florida Statutes, addresses what the declaration must contain, but the recorded documents for the particular condominium supply the actual boundaries.

Flooring is a good example. An owner may want to remove old carpet and install tile or luxury vinyl plank. The flooring is inside the unit, but the project can affect the concrete slab and the amount of sound transmitted to the unit below. The association may require a particular underlayment, product specifications, sound ratings, or approval before installation.

Bathroom work can raise different concerns. Replacing a vanity in the same location is different from moving a shower drain, cutting into the slab, changing supply lines, or replacing waterproofing. Once the project affects plumbing, structural components, or areas maintained by the association, the possibility of damage to other units becomes much more significant.

Florida law permits condominium bylaws to include requirements concerning the use, maintenance, and appearance of units and common elements. Section 718.112, Florida Statutes, does not establish one renovation procedure for every condominium. The association should still be able to identify the declaration, bylaw, amendment, or properly adopted rule that applies to the proposed work.

Section 718.113, Florida Statutes, also prohibits an owner from doing anything within the unit that adversely affects the safety or soundness of common elements or property maintained by the association. Its approval requirements for material alterations may become relevant when the work would alter common elements or association property. Whether a particular project reaches that point depends on the work and the condominium documents.

A building permit and association approval are separate. The city or county reviews compliance with applicable building codes. The association reviews the project under the condominium documents. Approval from one does not ordinarily replace approval from the other.

If I were reviewing a renovation request, I would want more than “kitchen renovation” or “new flooring.” I would want to know whether cabinets are staying in the same locations, whether any walls are being removed, whether plumbing or electrical service is moving, and whether the work touches the slab, exterior, fire-safety system, or another building component. Those details usually determine which requirements actually apply.

I would also confirm who has authority to approve the work. Management may collect the application, contractor information, insurance certificate, and deposit. Management may also arrange elevator access and working hours. That does not necessarily mean the property manager makes the approval decision. Depending on the documents, approval may come from management, a committee, the board, or more than one of them.

The final approval should be in writing and should identify any conditions. Those conditions may include soundproofing, waterproofing, permitted work hours, hallway or elevator protection, inspections, permit closeout, or proof that the work was completed according to the submitted plans. The owner should keep the application, plans, contractor information, permits, written approval, and related correspondence together.

Timing also matters. An owner may plan to complete the work between tenants or before listing the unit for sale. Contractor scheduling, association review, permits, material delivery, and inspections do not always occur on the same schedule. The unit should not be promised as ready for a tenant or buyer until the approvals and work needed to support that date are reasonably accounted for.

The fact that work is taking place inside the unit does not answer whether association approval is required. The better question is what the project will affect, who owns or maintains those parts of the property, and what the condominium documents require before the work begins.

Sources reviewed: November 3rd, 2026.